From March to May 2015, two*360ton Converters were transported from Tianjin port to Urumqi BY Clamp-type trailers.
The whole routes with around 4000km have been covered BY almost 2 months.
@ 2282.2cm x 514.0cm x 460.9 cm / 377MT each
COUNTRY SITES:中文ENGLISH