June~Dec.2018
Total around 16800CBM / 1990TON equipment ,including 26 OOG units with the longest 41m / widest 5.8m / highest 7.6m / heaviest 90ton from Ningbo ( and Shanghai) workshops to Ningbo heavy-lift terminal with reloading onto 3 river barges to Shanghai .At Shanghai Longwu terminal , trans-loading into ocean vessel with final destination to Omsk, Russia through arctic route and Vladivostok .