Wuxi & Zhangjiagang Chemical Equipment Systems

-From August to December, 2014 four tail gas compressors were delivered from Wuxi to Shanghai, where terminal handling was arranged BY us for direct reloading from waiting barges to ocean vessel for further transport to Russia.

-Total 146 units, including several oversized and heavy lifts with max.@ 29.80m x 4.75m x 5.30m/48.00MT & 30.10m x 4.62m x 5.02m/50.00MT of four tail gas drums, have been transported on 58 trailers ,4 deck barges BY multimodal transport ;

-During July 2014, 32 units of petrochemical equipment were delivered from Zhangjiagang, China to Manzhouli border, where reloading performed with further transport to Angarsk, Russia.

-The entire amount of cargo have been transported on 12 special trailers.

With the super oversized and heavy Tail Gas Drum

@29.77m x 4.58m x 4.86m/58.60MT;.

 

 

Chemical Equipment Systems
Chemical Equipment Systems
Chemical Equipment Systems
Chemical Equipment Systems
Chemical Equipment Systems
Chemical Equipment Systems
Chemical Equipment Systems
Chemical Equipment Systems
Chemical Equipment Systems
Chemical Equipment Systems
Chemical Equipment Systems
Chemical Equipment Systems
Chemical Equipment Systems
Chemical Equipment Systems

COUNTRY SITES:中文ENGLISH

© 2020 SINO PROJECTS (ANHUI) CO., LTD. All Rights Reserved.